Vehicle

2025 Porsche® Macan Electric Turbo

Kilometres: 14,311 • VIN: WP1AC2XA8SL175227 • Stock #: B55227

Was:

$129,995

Sale Price:

$129,995

Vehicle Specifications

Body TypeSUV
ConditionUsed
Mileage14,311
TransmissionAutomatic
DrivetrainAWD
Fuel TypeElectric
City MPG99
Highway MPG84
Exterior ColorBlack
Interior ColorBlack
Doors4
Towing Capacity4409

Features

  • Heated Seats
  • Power Seats
  • Leather Seats
  • Backup Camera
  • GPS Navigation
  • Keyless Entry
  • Sun/Moon Roof

Hours

  • Sunday:11:00am - 5:00pm
  • Monday:9:00am - 7:00pm
  • Tuesday:9:00am - 7:00pm
  • Wednesday:9:00am - 7:00pm
  • Thursday:9:00am - 7:00pm
  • Friday:9:00am - 6:00pm
  • Saturday:9:00am - 6:00pm

Address and contact information

13220 Smallwood Pl, Richmond, BC V6V 1W8

(604) 273-1661

Sale Price

$129,995
1/24

Price

Every reasonable effort is made to ensure the accuracy of the information listed above. Vehicle pricing, incentives, options (including standard equipment), and technical specifications listed may not match the exact vehicle displayed. Please confirm the accuracy of this information with a sales representative. Prices are subject to an additional $621 for new and $795 for used dealer preparation fee plus applicable taxes. Sales taxes, licensing, optional equipment, installation, administration, and other dealer program fees are not included.

Vehicle Information

While every effort has been made to ensure display of accurate data, including pricing data, the vehicle listings on this website may not reflect all accurate vehicle items. Accessories and color may vary. All Inventory listed is subject to prior sale. The vehicle photo displayed may be an example only. Vehicle Photos may not match exact vehicle?. Please confirm vehicle price with dealer. All materials on this site are presented to the user "as is" without warranty of any kind, either express or implied.

Vehicle Availability

Vehicles shown on this site may not currently be in dealer's inventory. Additionally, vehicles shown may be in the inventory of a partner dealership or a dealership with shared ownership. If this is the case, this vehicle is not in our inventory but can be made available to you at dealer's location within a reasonable time.

2025 Porsche® Macan

Electric Turbo

14,311

kilometres

Was

$129,995

Sale Price

$129,995

Sale Price
$129,995
I have read and agree to the Privacy Policy

Like this feature? See all vehicles with

Like this feature? See all vehicles with

Like this feature? See all vehicles with